Yesterday’s post contained a pretty significant mistake (aka “Big Fat Lie”). I showed a diagram that was in violation of the BPMN specification for intermediate message events. The post has been corrected, showing both the “bad” instructions, and the associated corrections. The proper way to use intermediate message events within […]
Business Process Modeling / Requirements / Requirements gathering
Posted on:
BPMN Diagrams – Flowing Intermediate Message Events
One of the 9 intermediate events in BPMN is the message intermediate event. There are two ways to use the message intermediate event, as an element in the sequence flow, or as an attachment to the boundary of an activity for exception processing. See how to use message intermediate events in a sequence flow. [Updated with correction of glaring error on Aug 22nd, 2006]